Tuesday, January 22, 2013

100 classic decoration experiences (Part 1)

Some knowledge based on my experience and the books were hard painstakingly sorted out a full 100 interior decorating notes, I hope to show here, for your reference and possible application to the renovation work of their own home. The renovation seems most people scratching their heads, in fact, I would think that the terror did not think so, the most important is to have some skills and learn from the experience of others. I would say 100 experience, but very useful, can help you a hand, welcoming also want your beautiful home at an early date.
1. Waterproof coating waterproof construction should be adopted
2. Waterproofing works should be completed in the covert construction and acceptance do
3. Waterproof construction is completed to do a water test
4. Bathrooms waterproof layer should be not less than 1.8 meters
5. Floor drain, angle, pipe, and other places to do more waterproof
6. Use deodorant floor drain floor drain
7. Hot and cold water pipes left hot right cold
8. The water pipes from the ground and try not to go
9. The cold water pipe to the protective layer in the wall to have 1cm, the hot water pipe is 1.5cm, therefore the groove to open the deep
10. PPR pipe installed to consider the paste good tile thickness, so the tube will not be exposed to
11. Cook a few minutes, have to buy vegetables take a long time.
12. Faucet and basin should be coordinated to fix not loaded up
13. Toilet install cement can’t be used, use silicone
14. Toilet, faucet installed should pay attention to protection
15. To consider when buying toilet pit distance
16. The washing machine to be considered on drainage or under drainage
17. The bathroom is best not to install the phone, easy to damp
18. Bathroom mirror first consider the size, or mirror front lamp is easily filled
19. The bathroom pipes are best left manholes
20. Strong electric weak can’t wear with a pipe yard
21. Left zero and right phase on the ground
22. An electrical outlet from the ground 300. 1.4 m switch
23. The switch should not be installed on the door behind
24. Socket a lot should be good
25. High-power electrical home accessories with 16A, toaster etc.
26. Cassette to better use
27. The cartridge must and panel matching, or they may be loaded on
28. PVC conduit wire cross-sectional area shall not exceed 40% of the cross-sectional area of the wire and tube
29. Bedroom air-conditioned not to implantation
30. Air conditioning hole to consider outward tilt, otherwise the rain will come
31. Lights as much as possible to consider a dual-control
32. The bathroom is best to install the splash socket
33. To consider a balcony outlet
34. The wire groove to smooth vertical and horizontal, lined according easy to use them in the future
35. Common flue loaded check valve
36. Bought appliances must be good to allow workers to read the instructions
37. Manual and warranty card information must remain good soil
38. Cement over the factory for three months can’t be used
39. Different varieties and grades of cement can’t be mixed
40. The yellow sand must use river sand, taste the flavor by mouth to know
41. Wall and floor tiles to be flooding for more than two hours, the dried paste
42. Wall and ceramic tiles would rather buy a few pieces, do not buy less, or prone to chromatic aberration
43. The wall can’t have two rows of non-integer brick
44. Rub seam completed tile immediately clean up
45. Ground paste marble (light-colored), stone back to do waterproof
46. Yang corner to cut a 45-degree angle.
47. Floor tiles to the floor drain at the tilt, or easy hydrocephalus
48. The wall met the pipe outlet to be used in the form of cut sets, so it looks monolithic brick
49. The ground the marble should dry Shop
50. Floor tiles must be dirt, non-slip, do not just to look good.

No comments: