51. Matte tiles difficult to clean up
52. Balcony tiles should pay attention to the construction of drainage direction
53. The keel best drying larch
54. Bought with a large sheet of wood necessary sawn air-dried
55. Woodworking horizontal approach must first bomb house
56. Color panel come in crucial buy paint brush again to prevent dirty
57. A ceiling fan can’t be installed on the ceiling keel
58. When the construction of the color panel to pre-pick the color
59. Ceiling design wall hanging bars distance shall not be greater than 300
60. Plasterboard use countersunk head tapping screws into the board 1-2MM, and do antirust processing, you can’t put a gun to nail
61. The distance between the plasterboard nails shall not be greater than 200
62. Gypsum board and wall 3MM seam for crack control treatment
63. Gypsum board, Yang corner to do the best sun angle of protection
64. Wooden doors up and down onto the scene at the paint brush
65. The bottom of the bathroom door pockets swipe waterproof
66. The size of the door should be consistent
67. Home as much as possible not to let a carpenter, also do not
68. Cabinetry try to buy the whole woodworking done well, the design does not work
69. Various sizes must consider the change up trouble
70. Do their own sliding glass door do not do dark orbit after no way to repair
71. A small bathroom, then try to do the sliding door, Do not open the door, representing
72. Not sure carpentry must be with the foreman more exchanges, do not let them own decisions
73. Money is the last word in the hands of
74. Have children at home, the glass less
75. We must allow workers a good look at the drawings
76. Kitchen drawers useful
77. Floor wooden keel flatness 5MM
78. The gross floor paved with 30 degrees or 45 degrees, board and board to stay 2-3MM directly sewn to stagger
79. To stay 8-10MM seam between the floor and the wall
80. Flooring longer than 8M to consider expansion joints
81. As little as possible to do with MDF Door
82. Hinges and hardware must choose good
83. Yuba to be mounted on a wooden keel, can’t be directly mounted on the ceiling
84. Dark-colored latex decorative painting construction try not watered, or prone to chromatic aberration
85. Plasterboard seams on a bandage
86. Wall gap on really cool cloth is better
87. Original wall putty best to eradicate or Brush glue cementing
88. Try not to use 88. Try to buy well-known brands of paint, decoration companies recommended or foreman recommended no fame
89. The weather is too wet, the paint brush Do
90. Paints, coatings, polished to wait after completely dry
91. Under a paint construction must be such as a paint dry before
92. The metal surface of the paint do rustproof treatment
93. The weather is too cold, the paint construction quality will be poor
94. Door paint, using textured paper stick hinge and door locks
95. Days is too hot, to pay attention to ventilation
96. Wallpaper paste to the wall brush edible vegetable oil
97. Hello Kitty wallpaper paste, put switch socket panel unloaded
98. Light mercerized latex paint to a complete complement prone to chromatic aberration
99. Baseboard installed to use putty and paint make up about sewing
100. Frosted glass to use newspaper to protect.